- #2 261
production 27/04= 3.96 kwh/kwc (20.72 pour 16 panneaux 327 ==> 5232wc)
production 28/04= 2.58 kwh/kwc (13,54kwh )
production 29/04= 3.57kwh/kwc (18,71kwh )
production 30/04= 5,49kwh/kwc (28,73kwh )
production 28/04= 2.58 kwh/kwc (13,54kwh )
production 29/04= 3.57kwh/kwc (18,71kwh )
production 30/04= 5,49kwh/kwc (28,73kwh )